UTC Depot & Workshop

Project Overview

A Responsive design, considering the Existing site conditions of 14 m wide segregated Entry & Exits have been provided for an easy traffic movement & Circulation. Warehouse shed has been provided at the centre of the site, whereas the workshop and depot block is located at the rear end of the site

Project Proposal

Following the design guidelines specified in the manual of designing and planning city depots by MOHUA, the different zones of the site have been allocated. The parking bays are located near the entry and exit points of the site, whereas, the fuelling and washing areas are located near the periphery of the site. Other Ancillary services have also been provided on the site which includes Tyre shop, two-level Godown. Dedicated parking for Visitors & office Staff has been provided – 16 Nos on stilt floor.

Project Details

UTC

Transportation

8.21 Acres

Dehradun

80% Completed

7431 sq. m.